Эксплуатация

Heater Installation

Procedure when installing the heater:

Before starting the installation, perform:

1.Exterior inspection (serviceability of the wire, integrity of its protective tube, housing and insulating parts).

  1. Choose a location for the wall heater. The recommended height of the bottom of the appliances from the floor is at least 100 mm, the size to the shelf or sill board above the appliance is at least 100 mm, the distance from the wall is 40-50 mm;
  2. The heater should not be installed in the immediate vicinity of a mains socket;
  3. Fix the heater to the wall;
  4. Connect the heater to the mains.

To extend the life of the heater, we recommend the following commissioning:

First commissioning

  1. Unpack the heater and leave it in a dry room for 12 to 24 hours at room temperature;
  2. Start the heater up in stages — switch the heater on for 20 minutes. After 20 minutes, disconnect the heater for 24 hours. After 24 hours the heater can be operated.

This procedure is necessary in order to:

 Allow the quartz heater to dry completely inside and out (so there are no electrical leaks). The quartz heater has changed color from «Gray» to «White Marble».

* Caution. Perform all electrical wiring work only when the mains wires are de-energized.

 NOTE.

During the first 24 hours the leakage current to the enclosure can exceed 30 mA, after 24 hours the leakage current becomes a safe value of 2 to 3 mA. The heater is Safety Class 1 (absolutely fire safe).

  • Heaters may be installed in any thermally insulated area, except areas where water will come in contact with the heater.
  • When the heater is in operation, the requirements set out in the «Safety Requirements» section must be followed;
  • Given the high fire safety of heaters economical for the house, they can be installed on any wall: a beam, batten, gypsum cardboard and walls made of other materials.

 

The heater is mounted with brackets on the wall

Follow the instructions below to install.

  1. Select a location to install the heater.
  2. Using a pencil, draw strokes as level and accurate as possible on the wall for the brackets.
  3. Drill 3 holes with a diameter of 6 mm using a drill.
  4. Then hammer in 3 dowels, and fasten the 3 brackets then fasten the heater.

 

WARRANTY OBLIGATIONS.

The manufacturer warrants the heater to operate normally during the warranty period, provided that the customer complies with the rules of transportation, storage and operation. Occurrence of individual, not-through, thread-shaped cracks up to 400 mm long, as well as chips on the edges of the heater does not affect the normal operation of the heater and is not a warranty case. The warranty period is 5 years from the date of purchase. The service life of the heater is at least 10 years from the date of commissioning.

MANUFACTURER

TURAN DAYANIKLI TÜKETİM MALLARI SANAYİ VE TİCARET LIMITED SİRKETİ

Address: GAZ LER MAH. 246 SK. NO: 3F KEPEZ / ANTALYA